Transportation

Drivers should watch for nighttime ramp closures on I-5 Oct. 12-15

VANCOUVER — Drivers who use Interstate 5 between Vancouver and Ridgefield should plan for possible delays this week. Washington State Department of Transportation (WSDOT) contractor Granite Construction will close several ramps for weather dependent pavement repair work. Closure details include: Wed., Oct. 12: The northbound I-5 on- and off-ramps to State Route …

By Clark County Today · October 10, 2016
  VANCOUVER — Drivers who use Interstate 5 between Vancouver and Ridgefield should plan for possible delays this week.   Washington State Department of Transportation (WSDOT) contractor Granite Construction will close several ramps for weather dependent pavement repair work.   Closure details include:
  • Wed., Oct. 12: The northbound I-5 on- and off-ramps to State Route 501 Pioneer Street/Ridgefield will close from 9 p.m. to 5 a.m.
  • Thu., Oct. 13: The southbound I-5 off- and on-ramps at SR-501 Pioneer Street/Ridgefield will close from 9 p.m. to 5 a.m.
  • Fri., Oct. 14: The southbound I-5 off- and on-ramps to Northeast 179th Street, the southbound I-5 off- and on-ramps at SR-502/Battle Ground, and the southbound I-5 off- and on-ramps to the Gee Creek Rest Area will close from 10 p.m. to 6 a.m.
  The work is part of a 10-mile resurfacing project on I-5 between the Clark County Event Center at the Fairgrounds and the North Fork Lewis River Bridge.   WSDOT offers a variety of tools to help drivers plan ahead. Get real-time traffic information with the WSDOT mobile app and by following the regional Twitter feed.

Related Coverage

VIDEO: Unfunded and over budget – The $15 billion gamble on I-5 bridge project
More Transportation coveragePolitics

VIDEO: Unfunded and over budget – The $15 billion gamble on I-5 bridge project

September 22, 2026
Goodbye, bumpy ride on I-5 in Vancouver
More Transportation coverageTransportation

Goodbye, bumpy ride on I-5 in Vancouver

September 15, 2026
Nighttime work on I-5 between Ridgefield and Woodland will replace damaged concrete panels Sept. 14-19
More Transportation coverageTransportation

Nighttime work on I-5 between Ridgefield and Woodland will replace damaged concrete panels Sept. 14-19

September 14, 2026
Washington Rep. John Ley warns ballooning bridge budget needs reality check
More Transportation coveragePolitics

Washington Rep. John Ley warns ballooning bridge budget needs reality check

September 11, 2026

Comments

Loading comments…