Transportation

Video: A look at the Interstate Bridge changes

A quick view of what the lane configurations will be on the Interstate Bridge for the next week or so.

By Clark County Today · September 20, 2020
Video: A look at the Interstate Bridge changes
A quick view of what the lane configurations will be on the Interstate Bridge for the next week or so.

Construction leads to major lane changes on Interstate 5 bridge over the Columbia River

Clark County Today wanted to provide a first-hand look at the work done on the Interstate Bridge this weekend as Clark County and Oregon drivers prepare for major changes for their commutes Monday.

The plan is to have two lanes going south and one lane going north on Monday morning. By Monday afternoon, that will switch to two lanes north and one south.

Regardless, drivers should expect delays as repairs to the bridge have closed all three lanes that are normally used for northbound traffic.

The closure is expected to last through Sept. 27.

Beyond the lane changes, there are several on-ramps closed near the bridge, both in Washington and in Oregon. There is no access to I-5 southbound from Highway 14. The downtown Vancouver onramp at West 5th Street and Washington Street is also blocked off by a barricade. 

On Sunday, Dana Hodge, who works for C&C Flagging, was stationed there directing traffic to the detours. She was also there to move the barricades for buses and construction vehicles, when necessary.

More safety crew members were on the bridge to caution pedestrians and bicyclists, reminding them that they need to share the walkway.

For more, see:

Related Coverage

VIDEO: Unfunded and over budget – The $15 billion gamble on I-5 bridge project
More Transportation coveragePolitics

VIDEO: Unfunded and over budget – The $15 billion gamble on I-5 bridge project

September 22, 2026
Goodbye, bumpy ride on I-5 in Vancouver
More Transportation coverageTransportation

Goodbye, bumpy ride on I-5 in Vancouver

September 15, 2026
Nighttime work on I-5 between Ridgefield and Woodland will replace damaged concrete panels Sept. 14-19
More Transportation coverageTransportation

Nighttime work on I-5 between Ridgefield and Woodland will replace damaged concrete panels Sept. 14-19

September 14, 2026
Washington Rep. John Ley warns ballooning bridge budget needs reality check
More Transportation coveragePolitics

Washington Rep. John Ley warns ballooning bridge budget needs reality check

September 11, 2026

Comments

Loading comments…