Letter: Immersed tunnel & electric buses, a 1% alternative to light rail

Bob Ortblad says an immersed tunnel will be safer, less costly, faster to build, more earthquake-resilient, with environmental benefits

By Bob Ortblad · July 27, 2026
Part of this storylineI-5 Interstate Bridge Replacement273 stories →
Listen to this story
Immersed Tunnel vs. Light Rail: A 1% Alternative for I-5
0:000:00
Letter: Immersed tunnel & electric buses, a 1% alternative to light rail

Editor’s note: Opinions expressed in this letter to the editor are those of the author alone and may not reflect the editorial position of ClarkCountyToday.com

The Interstate Bridge Replacement Program (IBR) plans to spend $3.5 billion on light rail to Expo Center with only two stations in Vancouver, neither station will serve the downtown center. The Waterfront Station (a goofy location 90 feet above ground) and Library Square Station will have park-and-ride garages for 1,270 cars.

These stations are designed for commuters to connect to MAX light rail and will provide poor service to downtown Vancouver. For 1% of this cost, $35 million, electric buses with half a dozen stops could better connect Clark College, Downtown, and the Waterfront (at ground level) to the MAX Expo Station. The failed Columbia River Crossing’s light rail plan had similar station locations.

inline image

An immersed tunnel for through freeway traffic enables the repurposing of current bridges for local traffic and bus connection to MAX Expo Station. An immersed tunnel would have eight lanes, and repurposed bridges could maintain six lanes for local traffic or be restriped to four. One or both current pedestrian bridge paths could be expanded to new 14-foot paths at a fraction of the cost for the IBR planned path that has a terrible 100-foot climb.

An immersed tunnel will be safer, less costly, faster to build, more earthquake-resilient, with environmental benefits. Its sunken approaches reduce noise, pollution, and visual blight. Its cut-and-cover sections will enable waterfront parks on both banks of the Columbia River.

Bob Ortblad MSCE, MBA

Seattle

Related Coverage

Opinion: Stop rewarding fiscal mismanagement on the IBR; enough is enough
More on I-5 Interstate Bridge ReplacementOpinion

Opinion: Stop rewarding fiscal mismanagement on the IBR; enough is enough

September 6, 2026
Opinion: IBR program’s $13-17 billion fraud and mismanagement, perpetuated by Vancouver Mayor Anne McEnerny-Ogle and Oregon Gov. Tina Kotek
More on I-5 Interstate Bridge ReplacementOpinion

Opinion: IBR program’s $13-17 billion fraud and mismanagement, perpetuated by Vancouver Mayor Anne McEnerny-Ogle and Oregon Gov. Tina Kotek

June 8, 2026
Opinion: Legislators demand two auxiliary lanes and challenge light rail plans for I-5 Bridge Replacement
More on I-5 Interstate Bridge ReplacementOpinion

Opinion: Legislators demand two auxiliary lanes and challenge light rail plans for I-5 Bridge Replacement

June 15, 2026
Letter: Buyer beware (caveat emptor)
More on I-5 Interstate Bridge ReplacementOpinion

Letter: Buyer beware (caveat emptor)

June 2, 2026

Comments

Loading comments…