Every published story — news, opinion and letters. Filter by section, author, type or publication date; the address bar keeps your search, so any view is easy to share or bookmark.
Contractor crews replaced damaged concrete with asphalt near Northeast 179th Street, and a permanent concrete fix is planned for a later date.
Three coordinated WSDOT projects will improve more than 6 miles of I-5 in Clark County, backed by a $25 million investment.
WSDOT crews will resurface a 2-mile southbound I-5 stretch nightly, closing the right lane and Exit 9 off-ramp.
The I-5 southbound ramp to I-205 at Exit 7 in Vancouver closes fully from 10 p.m. July 31 to 10 a.m. Aug. 2.
Marvin Badilla, 35, drove northbound in I-5's southbound lanes before striking two parked cars at a Safeway near NE Highway 99 and NE 129th Street.
The ramp from southbound I-5 to southbound I-205 at Exit 7 closes Friday night for pavement repairs and striping work.
The ramp from southbound I-5 to southbound I-205 at Exit 7 closes Friday night through Sunday morning for paving work.
A motorcyclist died after leaving the roadway on NE Worthington Rd. near Yacolt, transported by LifeFlight before succumbing to injuries.
Crews will use a smart work zone system with zipper merging to reduce delays during the I-205 closure.
Kerr Contractors Oregon LLC will close up to three southbound I-5 lanes between NE 179th St and the I-5/I-205 split through May 18.
A detached semi-truck tire struck a southbound minivan on I-5, sending the driver to a local hospital with moderate injuries.
WSDOT crews will close the left lane of southbound I-5 near Exit 11 from 9 a.m. to 3 p.m. Wednesday.