Opinion

Letter: ‘This unnecessary deadly design is criminal negligence’

Bob Ortblad discusses safety issues with the proposed grade of the I-5 Bridge replacement project.

By Bob Ortblad · February 17, 2023
Part of this storylineI-5 Interstate Bridge Replacement273 stories →
Letter: ‘This unnecessary deadly design is criminal negligence’
Bob Ortblad discusses safety issues with the proposed grade of the I-5 Bridge replacement project.
Bob Ortblad discusses safety issues with the proposed grade of the I-5 Bridge replacement project.

Bob Ortblad discusses safety issues with the proposed grade of the I-5 Bridge replacement project

Editor’s note: Opinions expressed in this letter to the editor are those of the author alone and do not reflect the editorial position of ClarkCountyToday.com

If the Interstate Bridge Replacement Program’s (IBR) extremely steep bridge is built, a semi-truck will fly off the bridge and crash onto downtown Vancouver. 

Bob Ortblad
Bob Ortblad

Bridge decks freeze before roadways because the air cools both the top and bottom surfaces. During winter months supercooled liquid droplets in fog will freeze instantly on the North-facing bridge deck forming dangerous black ice. With more warming sunshine the South slope will be ice-free. 

A trucker driving north on I-5 will be lulled into the safety of dry roads and an ice-free South slope. The truck will slow to 45 mph climbing the +4 percent ice-free South slope. At the bridge crest, as the grade flattens the truck will gear up to 55 mph and then accelerate to 65 mph on the down-hill slope. 

Two-hundred yards past the bridge crest the truck will hit black ice on the country’s steepest Interstate Highway bridge grade of -4 percent. Braking is useless on black ice and seconds later the truck will need to make a slight right turn. A 40-ton semi-truck cannot turn on black ice. At 65 mph it will crash through the bridge rail, falling 90 feet onto downtown Vancouver. 

This unnecessary deadly design is criminal negligence. The IBR continues to ignore a safer weather-protected immersed tunnel alternative that will protect Vancouver from a falling semi truck, noise, and freeway blight. 

Bob Ortblad MSCE, MBA
Seattle

Related Coverage

Opinion: Two bridges, one expanding bill
More on I-5 Interstate Bridge ReplacementOpinion

Opinion: Two bridges, one expanding bill

September 10, 2026
Letter:  IBR’s top truck speed 20 mph?
More on I-5 Interstate Bridge ReplacementOpinion

Letter: IBR’s top truck speed 20 mph?

September 8, 2026
Opinion: Stop rewarding fiscal mismanagement on the IBR; enough is enough
More on I-5 Interstate Bridge ReplacementOpinion

Opinion: Stop rewarding fiscal mismanagement on the IBR; enough is enough

September 6, 2026
t
Letter: ‘The pipe dream of putting light rail on it’
More on I-5 Interstate Bridge ReplacementOpinion

t Letter: ‘The pipe dream of putting light rail on it’

September 2, 2026

Comments

Loading comments…