
The traffic signals project will upgrade traffic and pedestrian signals to meet current regulations and traffic signal design standards, including installation of fiber optic Intelligent Transportation Systems
VANCOUVER – This spring, Clark County will upgrade several traffic signals throughout the county. The traffic signals project will upgrade traffic and pedestrian signals to meet current regulations and traffic signal design standards, including installation of fiber optic Intelligent Transportation Systems. The project also includes upgrading sidewalks to meet current ADA regulations.
This work includes constructing or upgrading traffic and pedestrian signals at:
- Northeast 27th Avenue at Northeast 134th Street
- Northeast 7th Avenue at Northeast Fraser Road
- Northeast 5th Avenue at Northeast 78th Street
- Northeast Hazel Dell Avenue – from Northeast 78th Street to Northeast 82nd Street
Construction is expected to begin in mid-April. Construction activities will occur between 7 a.m. and 5 p.m. on weekdays. For the safety of workers and the public, traffic lanes and/or sidewalks may be temporarily closed near worksites. Travels will be directed around closed lanes and sidewalks.
For more information about the project, visit clark.wa.gov/public-works/traffic-signal-upgrades.
For information about road and park projects, closures, opportunities for community input, and more, residents can follow Public Works on X (formerly known as Twitter), Facebook and Instagram and view information on Nextdoor. Residents can also visit clark.wa.gov/public-works to sign up for email notifications.
Go to clark.wa.gov/public-works/news to read this information in another language. Click the button in the top right of the page that says “Change language” next to a globe icon and choose your preferred language.
Information provided by Clark Co. WA Communications.
- Goodbye, bumpy ride on I-5 in VancouverThree coordinated WSDOT projects will improve more than 6 miles of I-5 in Clark County, backed by a $25 million investment.
- Nighttime work on I-5 between Ridgefield and Woodland will replace damaged concrete panels Sept. 14-19Granite Construction will close right and center lanes nightly on I-5 between mileposts 9.5 and 21.5 through Sept. 19.
- County seeks volunteers to serve on the Bicycle and Pedestrian Advisory CommitteeClark County seeks two volunteers, including one youth member, for its Bicycle and Pedestrian Advisory Committee; deadline is Oct. 11, 2026.
- Washington Rep. John Ley warns ballooning bridge budget needs reality checkRep. John Ley says the IBR ballooned from a $44M contract to a $13B–$15B project, with phase one still $2.2B short.
- POLL: The IBR project is described as only 30% designed and 30% funded after more than six years of work. How confident are you in the current management of the IBR program?IBR’s cost has climbed from $3.2–$4.8B to $15.2B while the project remains 30% designed and 30% funded.









