
Beginning Monday, WSDOT bridge crews will seal the driving surfaces of three bridges on SR 14 in Clark County. When it rains, water seeps into small cracks in the concrete
CLARK COUNTY – Travelers who use State Route 14 in Clark County should plan for lane closures and delays.
Beginning Monday, Aug. 4, the Washington State Department of Transportation bridge crews will seal the driving surfaces of three bridges on SR 14 in Clark County. When it rains, water seeps into small cracks in the concrete. In freezing temperatures, that water freezes and expands, making the cracks bigger and damaging the driving surface. Sealing the surface helps keep the water out, protects the bridge and extends its lifespan.
What to expect
Monday, Aug. 4:
- Travelers will take turns moving through one lane, directed by flaggers, in both directions of the 6th Avenue Bridge over SR 14 at milepost 12.6, from 8 a.m. to 3:30 p.m.
Tuesday, Aug. 5:
- Travelers will take turns moving through one lane, directed by flaggers, in both directions of the Ellsworth Bridge over SR14 at milepost 5.6, from 8 a.m. to 3:30 p.m.
Wednesday, Aug. 6 and Thursday, Aug. 7:
- Travelers will take turns moving through one lane, directed by flaggers, in both directions of SR 14 at the Evergreen Railroad Bridge (milepost 18.8), daily from 8 a.m. to 3:30 p.m.
Drivers should slow down, stay alert, and follow signs and flaggers direction during the sealing work.
Know before you go
Get real-time travel information via the WSDOT mobile app, the real-time travel map, or by signing up for email updates and alerts.
- Goodbye, bumpy ride on I-5 in VancouverThree coordinated WSDOT projects will improve more than 6 miles of I-5 in Clark County, backed by a $25 million investment.
- Nighttime work on I-5 between Ridgefield and Woodland will replace damaged concrete panels Sept. 14-19Granite Construction will close right and center lanes nightly on I-5 between mileposts 9.5 and 21.5 through Sept. 19.
- County seeks volunteers to serve on the Bicycle and Pedestrian Advisory CommitteeClark County seeks two volunteers, including one youth member, for its Bicycle and Pedestrian Advisory Committee; deadline is Oct. 11, 2026.
- Washington Rep. John Ley warns ballooning bridge budget needs reality checkRep. John Ley says the IBR ballooned from a $44M contract to a $13B–$15B project, with phase one still $2.2B short.
- POLL: The IBR project is described as only 30% designed and 30% funded after more than six years of work. How confident are you in the current management of the IBR program?IBR’s cost has climbed from $3.2–$4.8B to $15.2B while the project remains 30% designed and 30% funded.









