Transportation

Annual maintenance work to close I-5 Gee Creek rest areas, Oct. 18-22

The rest areas located on both directions of I-5 near Battle Ground and the State Route 502 interchange (Exit 11) will close for annual maintenance work.

By Clark County Today · October 12, 2021
Annual maintenance work to close I-5 Gee Creek rest areas, Oct. 18-22
The rest areas located on both directions of I-5 near Battle Ground and the State Route 502 interchange (Exit 11) will close for annual maintenance work.

The rest areas located on both directions of I-5 near Battle Ground and the State Route 502 interchange (Exit 11) will close for annual maintenance work

RIDGEFIELD – Travelers on Interstate 5 who need to take a break from the road will need to find other facilities between Mon., Oct. 18 – Fri., Oct 22.

The rest areas located on both directions of I-5 near Battle Ground and the State Route 502 interchange (Exit 11) will close for annual maintenance work.
File photo.

Next week, the Washington State Department of Transportation will close the Gee Creek rest areas located on both directions of I-5 near Battle Ground and the State Route 502 interchange (Exit 11) for annual maintenance work.

Closure details

  • The northbound and southbound Gee Creek rest areas will be closed from 6 a.m. Mon., Oct. 18 until 5 p.m. Fri., Oct. 22.

During the closure, WSDOT maintenance crews will deep clean each location, repair damaged picnic areas, update landscaping and conduct routine safety inspections of the electrical and plumbing systems.

Both rest areas are among the busiest in the state, with more than 1 million annual visitors utilizing both facilities, a figure calculated by the number of toilet flushes. 

Know before you go

Before heading out the door, travelers can check the latest road conditions and get real-time roadway and weather information, 24/7 via the WSDOT mobile app or by following the Southwest Region Twitter account.

Related Coverage

VIDEO: Unfunded and over budget – The $15 billion gamble on I-5 bridge project
More Transportation coveragePolitics

VIDEO: Unfunded and over budget – The $15 billion gamble on I-5 bridge project

September 22, 2026
Goodbye, bumpy ride on I-5 in Vancouver
More Transportation coverageTransportation

Goodbye, bumpy ride on I-5 in Vancouver

September 15, 2026
Nighttime work on I-5 between Ridgefield and Woodland will replace damaged concrete panels Sept. 14-19
More Transportation coverageTransportation

Nighttime work on I-5 between Ridgefield and Woodland will replace damaged concrete panels Sept. 14-19

September 14, 2026
Washington Rep. John Ley warns ballooning bridge budget needs reality check
More Transportation coveragePolitics

Washington Rep. John Ley warns ballooning bridge budget needs reality check

September 11, 2026

Comments

Loading comments…