
Lewallen’s visit comes as the IBR team continues to advance plans that include light rail despite widespread pushback from citizens and leaders in Clark County
Washington, D.C. – On Friday (June 13), Camas City Councilor Leslie Lewallen traveled to the U.S. Department of Transportation to speak directly with federal officials regarding the Interstate Bridge Replacement (IBR) project and the growing opposition in Southwest Washington to the proposed light rail extension.
Lewallen met with key members of Secretary Shawn Duffy’s leadership team, including the secretary’s chief of staff, chief counsel, and three senior federal transit attorneys. During the meeting, she expressed serious concerns about the inclusion of light rail in the project—an element that has been widely opposed by residents, elected officials, and local municipalities such as Camas and Battle Ground.
“This project has the potential to be a generational opportunity to improve infrastructure between Washington and Oregon,” said Councilor Lewallen. “But tying it to a multi-billion-dollar light rail extension that our community does not want and cannot afford is the wrong approach. Southwest Washington needs real solutions, not political pet projects that burden taxpayers and bring in problems from across the river.”
Lewallen authored the resolution unanimously passed by the Camas City Council opposing light rail in the IBR project. Shortly after, the city of Battle Ground passed a similar resolution.

Her visit comes as the IBR team continues to advance plans that include light rail despite widespread pushback from citizens and leaders in Clark County. Lewallen emphasized the need for practical alternatives that address real transportation needs — such as traffic congestion, emergency access, and freight mobility — without importing Portland’s troubled transit issues.
“I’m committed to ensuring the voices of Camas and my neighbors in Southwest Washington are heard in Washington, D.C.,” Lewallen added. “We deserve infrastructure that serves our families and businesses, not out-of-touch mandates driven by political agendas.”
For more information about Councilor Leslie Lewallen and her ongoing advocacy for Camas and Southwest Washington, visit www.LeslieForCamas.com.
- Goodbye, bumpy ride on I-5 in VancouverThree coordinated WSDOT projects will improve more than 6 miles of I-5 in Clark County, backed by a $25 million investment.
- Nighttime work on I-5 between Ridgefield and Woodland will replace damaged concrete panels Sept. 14-19Granite Construction will close right and center lanes nightly on I-5 between mileposts 9.5 and 21.5 through Sept. 19.
- County seeks volunteers to serve on the Bicycle and Pedestrian Advisory CommitteeClark County seeks two volunteers, including one youth member, for its Bicycle and Pedestrian Advisory Committee; deadline is Oct. 11, 2026.
- Washington Rep. John Ley warns ballooning bridge budget needs reality checkRep. John Ley says the IBR ballooned from a $44M contract to a $13B–$15B project, with phase one still $2.2B short.
- POLL: The IBR project is described as only 30% designed and 30% funded after more than six years of work. How confident are you in the current management of the IBR program?IBR’s cost has climbed from $3.2–$4.8B to $15.2B while the project remains 30% designed and 30% funded.










