Randal O’Toole provides an executive summary of a report that indicates TriMet and the region should immediately cease all planning for infrastructure-heavy transit projects, including light rail
Randal O’Toole
for Cascade Policy Institute
The pandemic has made it painfully clear that TriMet’s business model is hopelessly out of date. Trends that began decades ago — the dispersion of jobs and residences, telecommuting, and growing automobile ownership — were accelerated or at least continued by the pandemic. Yet TriMet, the Portland area’s largest transit agency, still operates a route structure that was designed for the early 1900s.
Prior to the pandemic, instead of updating TriMet’s business model, Metro and TriMet attempted to redevelop the Portland area to look more like it did in 1910, using the urban-growth boundary to increase overall population densities and transit-oriented developments to increase densities at the city center and along major transit corridors. Yet, they can’t reverse the trends that made TriMet’s route structure obsolete: the dispersion of jobs from downtown, near-universal automobile ownership, and the automobile’s huge advantages over traditional transit in terms of speed and access to the entire urban area.
Metro and TriMet’s biggest mistake was to rely on Big-Box Transit — transit vehicles with high capacities but whose route capacities are often low — that is expensive to build, inflexible in the face of rapidly changing transportation patterns, serves only a small portion of the urban area, and doesn’t really make sense in a region whose jobs are finely distributed across the landscape rather than concentrated in a single downtown. While light rail has been particularly expensive, the Westside Express Service (WES) is almost a parody of this problem, costing $7.5 million a year to operate and never generating enough fares to cover much more than 8 percent of its operating costs.
Data showing transit’s share of commuting reveals how badly TriMet’s overall system was working before the pandemic. While TriMet carried 42 percent of downtown workers to and from their jobs in 2018, downtown held less than 10 percent of all jobs in the urban area. Outside of downtown, TriMet carried just 3.4 percent of workers to and from their jobs. Though Portland has been celebrated as “the city that loves transit,” the reality is that TriMet provides terrible service to 90 percent of the region’s workers and job centers.
The pandemic drastically reduced downtown’s role as a job center, and it may never recover many of its former workers who are now productively employed at home. The high-income workers who once rode light rail are now working at home, while low-income workers who once took the bus have increased their automobile ownership and reduced their dependence on transit. Ridership may never recover, yet TriMet faces nearly $3 billion in debt plus pension and health care liabilities.
This paper looks at three alternative ways of reforming TriMet for the 21st century. First is to convert TriMet’s downtown-centric route system into a polycentric system with multiple hubs all connected with one another by non-stop buses along with local buses radiating away from each hub. Second is to entirely replace fixed bus routes with an on-demand system, something like Uber Pool. Third is to reallocate TriMet’s operating subsidies to transit riders in the form of discount vouchers, with lower-income people getting higher discounts, thus targeting subsidies based on incomes and giving TriMet better information about where people want to travel.
The paper found that a nine-hub system with up to five buses per hour on all routes would cost no more than TriMet is currently spending on bus operations. Average bus speeds would nearly double, and speeds between hubs would be nearly triple light-rail speeds, thus attracting far more riders than TriMet is carrying today. An Uber Pool system would force TriMet to increase fares anywhere from double to octuple current fares and thus probably isn’t viable except in places where subsidies are already high. A discount voucher program could work, but it could be unnecessarily complicated for few benefits.
TriMet’s most important problem is its focus on downtown Portland. In 2021, Hillsboro had 83,000 jobs, far more than are currently found in downtown Portland. Beaverton had 64,000 and Gresham more than 37,000. If TriMet is to remain relevant in the future, it needs to redesign its system to serve these and other job centers as well as it serves downtown. Based on this analysis, this report recommends that:
- TriMet and the region should immediately cease all planning for infrastructure-heavy transit projects, whether light rail, streetcar, or bus-rapid transit with dedicated bus lanes.
- TriMet should immediately terminate the WES commuter-rail line, even if it means repaying a depreciated share of the federal government’s costs back to the feds, and plan to replace light-rail lines with buses when the rail lines are fully depreciated.
- TriMet should change its current, downtown-centric bus system into a polycentric system with at least nine transit centers offering non-stop bus service to every other center and local bus routes radiating away from each center.
- TriMet should test on-demand microtransit systems in parts of the region that currently have low transit usage (meaning high subsidies per rider) and also test a discount voucher program for low-income riders to determine if such vouchers would truly help low-income people as well as give TriMet better information about changing transportation patterns.
- Metro, TriMet, Portland, and other cities in the region should stop subsidizing transit-oriented developments, which have done little to boost transit ridership and, due to their high construction costs, make little contribution to housing affordability.
- To enable it to nimbly respond to changing transportation patterns, TriMet should rapidly pay down its debts and reduce unfunded pension and health care liabilities to zero.
Randal O’Toole is a land-use and transportation policy analyst and director of the Oregon-based Thoreau Institute. His most recent book is Romance of the Rails: Why the Passenger Trains We Love Are Not the Transportation We Need. In addition to working with state-based think tanks such as Cascade Policy Institute, he has had fellowships at Yale, the University of California at Berkeley, and Utah State University.
Also read:
- Opinion: John Ley pens letter to Transportation Secretary Pete ButtigiegJohn Ley challenges the I-5 Bridge Replacement project, urging Secretary Pete Buttigieg to reconsider federal funding.
- Marie Gluesenkamp Perez submits I-5 Bridge public commentRep. Marie Gluesenkamp Perez pushes for extended I-5 Bridge public comment period.
- Expect nighttime delays on southbound I-5 near Woodland, Nov. 19Expect delays on southbound I-5 near Woodland on Nov. 19 for lane repairs improving driving safety on the North Fork Lewis River Bridge.
- Washington state still grappling with ongoing EV charging challengesWashington state faces challenges meeting demand for EV charging infrastructure, with an estimated need of 3 million ports by 2035.
- Northbound Interstate Bridge will close Monday, Nov. 18 for maintenanceNorthbound lanes on the Interstate Bridge will close Monday night for maintenance, reopening early Tuesday.